| 名稱 | 盧緯綸建築規劃有限公司 llewelyn-davies hong kong limited |
| 地址 | 香港鰂魚涌船塢里10-12號長華工業大廈10樓 10/f, cheung wah industrial building, 10-12 shipyard lane, quarry bay, hong kong |
| 電話號碼 | 2869 8661 |
| 傳真號碼 | 2526 3281 |
| 電郵地址 | [email protected] |
| 聯絡人 | esther ng |
| 職位 | head of admin & hr |
| 成立年份 | 1983 |
| 員工總數 | 63 |
| 註冊建築師總數 | 8 |
| 獲授權人總數 | 3 |
提供服務 services
- alterations & additions works and minor works
- civic / community buildings
- commercial
- educational
- entertainment
- green & sustainability
- healthcare
- heritage & conservation works
- hospitality
- industrial
- interior design
- master-planning
- religious
- sports
- transport & infrastructure
建築作品
cathay pacific airways headquarters – cathay city
ld asia was involved in the formulation of the brief, site selection, facility planning, as well as detailed architectural, interior design and landscape services. total floor area exceeds 93,400sqm, comprising 61,400sqm of offices, a crew processing centre, a 500-room staff hotel, leisure centre, workshops, organised around an internal street containing a food court, retail units and other staff facilities. total construction cost was about 1,800m.
year of completion : 2000
mtrc lok ma chau terminus
the lok ma chau terminus is the terminating station of east rail extension spur line branching from the existing east rail just north of sheung shui station. as a gateway to mainland china, the new terminus will comprise of a three level train station and a two level immigration and custom hall in phase 1with gfa more than 66,000sqm. total construction cost was about hk$2,000m.
year of completion : 2006
hospital authority – redevelopment of yan chai hospital, hong kong
the scope of this project involves the demolition and redevelopment of existing blocks into a new proposed community health and wellness centre and the construction of a link bridge. also the demolition of 2 blocks after the existing outpatient and associated ancillary facilities have been decanted to the new block upon its completion. total construction cost is about hk$647m.
year of completion : 2013
hong kong academy new campus
the project is to design and construct the new campus of hong kong academy, located in sai kung, to provide a stimulating and quality learning environment. particular emphasis is placed on sustainability and green features. the multi-storey building campus, which has a total gfa at about 23,000sqm, comprises teaching rooms, laboratories, libraries, sports and performing art facilities, cafeteria, offices and other necessary ancillary facilities. total construction cost will be about hk$350m.
year of completion : 2013
hong kong baptist university – school of communication-cum-school of creative/ visual arts building
the project comprises the construction of a building of area abut 17,759m? to accommodate the school of communication and the school of creative/ visual arts including offices, lecture theatres, classrooms, studios, laboratories, workshops, gallery, library, media & resources rooms and storage area for the faculty and the departments, carparks and associated external works. total construction cost was about hk$275m.
year of completion : 2010
international christian school, shatin
the project comprises the construction of a new through-train primary-cum-secondary school pis comprising 15 primary classes, 21 secondary classes and associated facilities, such that the developments could be integrated to form a single campus. associated facilities which include the conference room, a guidance activity centre, 2 tournament standard indoor gymnasiums provide venues for multi-purpose use including performances, etc. total construction cost was about 280m.
year of completion : 2007
architectural services department tsing yi northeast park
the project site in area 9 tsing yi comprises a former private shipyard and a large portion of reclaimed land under the reclamation project. the project site covering a total area of about 58,000 sqm. the site is zoned as “o” under the tsing yip outline zoning plan no. s/ty/19. total construction cost is 161m.
year of completion : 2010
west kowloon cultural district development plan
ld asia was commissioned by wkcd authority to prepare the detailed development plan for the 40ha west kowloon cultural district for consideration by the town planning board.
year of completiion : 2012
fiffort rebranding loft shopping, north point, hong kong
to provide external fa?ade refurbishment and interior design for the refurbishment of fitfort shopping centre in north point. total area is around 19,500sqm. the total construction cost was about hk$50m.
year of completion : 2011
citylink plaza, shatin
to provide external fa?ade refurbishment and interior design for the renovation of city one plaza, city one shatin. total area is around 30,500sqm. the total construction cost is about hk$100m
year of completion : 2012
附註 notes:
盧緯綸建築規劃有限公司llewelyn-davies hong kong limited位於香港鰂魚涌船塢里10-12號長華工業大廈10樓,以上資料由建築師事務所自願提供,brokwiki收集於網絡,但並不保證其真確性。