Advanced Construction Information Development Limited (A.C.I.D.) Advanced Construction Information Development Limited (A.C.I.D.)

名稱advanced construction information development limited (a.c.i.d.)
advanced construction information development limited (a.c.i.d.)
地址新界荃灣海盛路3號tml廣場35樓a2室
a2, 35/f, tml tower, 3 hoi shing road, tsuen wan, hong kong
電話號碼3468 5250 
傳真號碼3585 5599 
電郵地址[email protected] 
聯絡人 
職位 
成立年份2014 
員工總數21 
註冊建築師總數
獲授權人總數

提供服務 services

  • alterations & additions works and minor works
  • civic / community buildings
  • commercial
  • educational
  • green & sustainability
  • healthcare
  • heritage & conservation works
  • hospitality
  • industrial
  • religious
  • residential
  • transport & infrastructure

建築作品

asd heritage consultancy – victoria peak fire station, hong kong

graded 2 historical building located on the top of victoria peak, hong kong. the building was built over 100 years ago as english student dormitories and was renovated to a fire station at 60s. scope is to help asd to establish “heritage information modelling” (him) as a prototype using bim technology.
completion year: 2015

henderson commercial development in pottinger street, hong kong

located in central, hong kong, this is a 33-storeyed commercial development. the proposed gfa is 12,635 sq.m. for this site which area is 843 sq.m. several teams share the cloud platform in different locations. client, designer and consultant work with cloud to co-ordinate and monitor the program.
completion year: 2015

vtc student dormitory, hong kong

14-storey high student dormitory at hong kong institute of vocational education, tsing yi campus, with total construction area at 19,152 sq.m. drawings and models were produced with bim technology and clash detection to find design errors for design improvement. 4d animation videos were produced from navisworks for construction sequence testing.
completion year: 2015

tang city – 101, china

one of the largest residential developments in tang shan city, hebei province, china.the total area of 300,000 sq. m, the plot ratio of 2.38, with a total construction area ofnearly one million sq. m. a series of flats for selection, such as high-rise apartment,townhouse and villa.
completion year: 2014

hong kong polytechnic university redevelopment of block x, hong kong

a multi-functional building in hung hom campus, hong kong. bim model for all discipline will be set up in revit, clash detection will be done in glue. the as-built model to be collected from contractor. after running through the cobie system, the model will be transferred to ecodomus and maximo for facility management.
completion year: 2015

hkha hos project – video and 3d printing from bim, hong kong

consultancy services have been provided for the production of virtual walkthrough video and physical doll house models of two flat modules for hkha home ownership scheme 2014 (sheung chui court in tsuen wan and mei pak court in sha tin). scope includes bim models building, rendering & post-production, 3d printing.
completion year: 2014

kangmei office, china

this is a mixed-use development comprises office, retail and hotel / serviceapartment. full bim services include bim modelling, clash analysis and issue ofprofessional drawings for submission and construction.
completion year: 2014

zoucheng project, shandong province, china

combining the residential and commercial development, together with park andcommunity amenities, this is one of the largest residential developments in zoucheng,shandong province, china. the total area is 462,000 sq.m. with a total constructionarea of 336,000 sq.m.
completion year: 2015

yili shanhaisong project, qinzhou city, china

consists of hotel, clubhouse and golf course with consistent planning. the total areaof 186,000 sq.m., the plot ratio of 0.9 – 1.3 with total construction area more than200,000 sq.m. full services include feasibility analysis, project planning, constructiondrawings design, construction management and property management.
completion year: 2014

sanya – a digital city, china

the revolutionary concept of cim (city information modelling) has been applied.integrating with the data of drainage and electricity provided by the government,viewable objects (e.g. buildings, trees) and non-viewable objects (e.g. undergrounddrainage system) in reality can be combined for providing accurate information onroads and pipelines enhancement.
completion year: 2013

附註 notes:

advanced construction information development limited (a.c.i.d.)advanced construction information development limited (a.c.i.d.)位於新界荃灣海盛路3號tml廣場35樓a2室,以上資料由建築師事務所自願提供,brokwiki收集於網絡,但並不保證其真確性。

發佈留言 0

Your email address will not be published. Required fields are marked *