名稱 | at zero design limited at zero design limited |
地址 | 香港北角英皇道370-374號掁華大廈12樓b室 office b, 12/f, china harbour building, 370-374 king’s road, north point, hong kong |
電話號碼 | 3115 7748 |
傳真號碼 | 2571 0718 |
電郵地址 | [email protected] |
聯絡人 | chan yuk shing |
職位 | director |
成立年份 | 2005 |
員工總數 | 19 |
註冊建築師總數 | 3 |
獲授權人總數 | 2 |
提供服務 services
- civic / community buildings
- commercial
- educational
- interior design
- residential
建築作品
coach queen’s road central
year of completion – to be completed by 2008
client – coach
location – queen’s road central, hong kong
area – 1000 sqm
works – internal a&a works, fa?ade works (4-storey) and fit-out works
emporio armani beijing ccpm
year of completion – to be completed by 2008
client – giorgio armani hk ltd
location – shin kong mitsukoshi department store, beijing, prc
area – 1500 sqm
works – internal a&a works, fa?ade works (2-storey) and fit-out works
emporio armani canton road
year of completion – 2007
client – giorgio armani hk ltd
location – harbour city, canton road, hong kong
area – 300 sqm
works – internal a&a works, fa?ade works (1-storey) and fit-out works
emporio armani accessories & armani / dolci
year of completion – 2006
client – giorgio armani hk ltd
location – chater house, central, hong kong
works – fit-out works
giorgio armani beijing
year of completion – 2006
client – giorgio armani hk ltd
location – peninsular palace, beijing, prc
area – 250 sqm
works – fit-out works
nike beijing flagship store
year of completion – 2007
client – nike sports (china) co.,ltd
location – sun dong an, wang fu jing, beijing, prc
area – 1000 sqm
works – internal a&a works, fa?ade works (2-storey) and fit-out works
nike hk flagship store
ear of completion – 2007
client – nike hong kong ltd
location – canton road, hong kong
area – 500 sqm
works – internal a&a works, fa?ade works (3-storey) and fit-out works
tong hang 11-house residential complex development
year of completion – 2007
client – hing ah development ltd
setting – eleven houses are built at the entrance of tong hang village of fanling.
exterior – the houses are designed to achieve a sense of prestige with a limited budget.
proportional relationship between balcony, fenestration and architectural features are carefully studied.
interior – each house is divided into one duplex unit with front garden and one top storey unit with a roof garden overlooking the surrounding.
tong hang 30-house residential complex development
year of completion – 2008
client – famebo development ltd
setting – 30 houses are inserted in a natural setting of tong hang village in fanling.
exterior – the objective is to dissolve the barriers between inside and outside in modern form.
this sense of harmony is expressed in a new material palette which includes sensuous stone and wood.
interior – the scheme divides the volume into different units, each occupying a single floor or duplex floors. each unit also incorporates different forms of outside spaces- sky deck, balcony or garden.
man uk pin twin residential townhouses
year of completion – 2008
client – asia act ltd
setting – two houses are situated in fanling and enjoy a scenic greenery view.
exterior – a hollow wooden box [analogy of treehouse] is designed to hang onto a simple rectangular solid box resting peacefully within the surrounding.
interior – an unique semi-outdoor sun deck allows end-users comfortably enjoy the magnificent view in a different way.
附註 notes:
at zero design limitedat zero design limited位於香港北角英皇道370-374號掁華大廈12樓b室,以上資料由建築師事務所自願提供,brokwiki收集於網絡,但並不保證其真確性。