名稱 | 嘉聯設計有限公司 quartect design limited |
地址 | 香港永樂街28-34號東成商業大廈12樓b-c室 units b-c, 12/f, 88 commercial building, 28-34 wing lok street hong kong |
電話號碼 | 2541 9128 |
傳真號碼 | 2541 9130 |
電郵地址 | [email protected] |
聯絡人 | kung chi ho joseph |
職位 | executive director |
成立年份 | 2005 |
員工總數 | 9 |
註冊建築師總數 | 2 |
獲授權人總數 | 1 |
提供服務 services
- alterations & additions works and minor works
- educational
- hospitality
- industrial
建築作品
hayward pool products factory
developer: hayward industries inc., usa
project location: export process zone, wuxi, jiangsu, china
project information:
site area: 36,500 m2
gross floor area: 21,700 m2 (phase 1)
no. of floors: 1.5-storey
building nature: the facility, which consists of a combined office, factory and utility building, is designed for the manufacture and fabrication of moulded plastic pumps, filters, accessories, etc. for swimming pools.
year of completion: 2007
jabil circuit factory
developer: jabil circuit group, usa
design build contractor: china state construction & engineering corporation
project location: getdd, guangzhou, china
project information:
site area: 145,000 m2
gross floor area: 122,800 m2 (phase 1)
building nature: the facility is made up of one 2-storey admin building, one 1.5-storey production building, one 2-storey amenity building, five 8-storey dormitory buildings, etc. it is designed for the manufacture and fabrication of electronic products, and for the accommodation of 8,000 staff and workers.
year of completion: 2002
gates unitta power transmission factory
developer: gates unitta asia (a j/v between gates corporation, usa and nitta corporation, japan)
project location: sip, suzhou, jiangsu, china
project information:
site area: 48,500 m2
gross floor area: 28,500 m2
building nature: a manufacturing facility, made up of a 1.5-storey office/ production building, a 3-storey boiler building, a 1-storey central utility building, etc., is designed for the manufacture of rubber transmission belts for the automotive industry.
year of completion: 2004
mou fung denim factory
developer: mou fung ltd, hong kong
project location: lingang, zhuhai, guangdong, china
project information:
site area: 184,000 m2
gross floor area: 149,650 m2
building nature: the facility, which consists of three 1-storey long span factory buildings for weaving looms, indigo dying machines, finishing machines, one 1.5-storey warehouse building, one 3-storey admin building, three multi-storey amenity and dormitory buildings, etc., is designed for the manufacture of denim fabric.
year of completion: 2003
sabert plastic factory
developer: sabert corporation, usa
project location: sanxiang, zhongshan, guangdong, china
project information:
site area: 100,500 m2
gross floor area: 34,600 m2 (phase 1)
building nature: a facility, which consists of one 2-storey office building, one 1-storey production/warehouse building, one 2-storey central utility building, one 4-storey dormitory building, etc., is designed for the manufacture of moulded plastic tableware of platters, lids, bowls, utensils and packaging products.
year of completion: 2006
phelps dodge magnetic wire factory
developer: phelps dodge corporation, usa
project location: sip, suzhou, jiangsu, china
project information:
site area: 26,000 m2
gross floor area: 13,000 m2
no. of floors: 1.5-storey
building nature: a facility, which consists of office, production, warehouse and utilities buildings, is designed for the manufacture of magnetic copper wires for electric motors.
year of completion: 2003
techtronics industrial park
developer: techtronics industries ltd, hong kong
project location: houjie, dongguan, guangdong, china
project information:
site area: 275,000 m2
gross floor area: 384,000 m2
building nature: a private industrial park, which consists of one 6-storey admin building, six 3-storey production buildings, one 3-storey central warehouse building, several 6-storey dormitory and amenity buildings, etc., is designed for the manufacture and fabrication of power tools, floor care products and garden care products, and for the accommodation of 12,000 staff and workers.
year of (design) completion: 2004
emerson copeland climate technologies factory
developer: emerson motor technologies, usa
project location: sip, suzhou, jiangsu, china
project information:
site area: 99,800 m2
gross floor area: 29,000 m2
no. of floors: 1.5-storey
building nature: a manufacturing facility, developed in three phases, is designed for the manufacture and fabrication of scroll compressors and hermetic motors for air conditioners.
year of completion: 1998 (phase 1), 1999 (phase 2), 2001 (phase 3)
zastron flexible printed circuit factory
developer: zastron precision-tech ltd, hong kong
project location: wuxi new district, wuxi, jiangsu, china
project information:
site area: 43,700 m2
gross floor area: 48,700 m2
no. of floors: 3-storey
building nature: a facility, which consists of high precision workshops, clean rooms, electroplating workshops, etc. is designed for the manufacture and fabrication of flexible printed circuits applied in advanced electronic products.
year of completion: 2009
chai wan public fill barging point
developer: cedd, hong kong government sar
project location: adjoining chai wan cargo basin
project information:
a facility, designed to handle earth materials which are trucked in, weighed, tolled, staged and barged to fill, includes a combined admin building, a combined reception office building, a tipping hall building, a sampling facility building, two exit office buildings, etc.
year of completion: 2008
附註 notes:
嘉聯設計有限公司quartect design limited位於香港永樂街28-34號東成商業大廈12樓b-c室,以上資料由建築師事務所自願提供,brokwiki收集於網絡,但並不保證其真確性。