嘉聯設計有限公司 Quartect Design Limited

名稱嘉聯設計有限公司
quartect design limited
地址香港永樂街28-34號東成商業大廈12樓b-c室
units b-c, 12/f, 88 commercial building, 28-34 wing lok street hong kong
電話號碼2541 9128 
傳真號碼2541 9130 
電郵地址[email protected] 
聯絡人kung chi ho joseph 
職位executive director 
成立年份2005 
員工總數
註冊建築師總數
獲授權人總數

提供服務 services

  • alterations & additions works and minor works
  • educational
  • hospitality
  • industrial

建築作品

hayward pool products factory

developer: hayward industries inc., usa
project location: export process zone, wuxi, jiangsu, china
project information:
site area: 36,500 m2
gross floor area: 21,700 m2 (phase 1)
no. of floors: 1.5-storey
building nature: the facility, which consists of a combined office, factory and utility building, is designed for the manufacture and fabrication of moulded plastic pumps, filters, accessories, etc. for swimming pools.
year of completion: 2007

jabil circuit factory

developer: jabil circuit group, usa
design build contractor: china state construction & engineering corporation
project location: getdd, guangzhou, china
project information:
site area: 145,000 m2
gross floor area: 122,800 m2 (phase 1)
building nature: the facility is made up of one 2-storey admin building, one 1.5-storey production building, one 2-storey amenity building, five 8-storey dormitory buildings, etc. it is designed for the manufacture and fabrication of electronic products, and for the accommodation of 8,000 staff and workers.
year of completion: 2002

gates unitta power transmission factory

developer: gates unitta asia (a j/v between gates corporation, usa and nitta corporation, japan)
project location: sip, suzhou, jiangsu, china
project information:
site area: 48,500 m2
gross floor area: 28,500 m2
building nature: a manufacturing facility, made up of a 1.5-storey office/ production building, a 3-storey boiler building, a 1-storey central utility building, etc., is designed for the manufacture of rubber transmission belts for the automotive industry.
year of completion: 2004

mou fung denim factory

developer: mou fung ltd, hong kong
project location: lingang, zhuhai, guangdong, china
project information:
site area: 184,000 m2
gross floor area: 149,650 m2
building nature: the facility, which consists of three 1-storey long span factory buildings for weaving looms, indigo dying machines, finishing machines, one 1.5-storey warehouse building, one 3-storey admin building, three multi-storey amenity and dormitory buildings, etc., is designed for the manufacture of denim fabric.
year of completion: 2003

sabert plastic factory

developer: sabert corporation, usa
project location: sanxiang, zhongshan, guangdong, china
project information:
site area: 100,500 m2
gross floor area: 34,600 m2 (phase 1)
building nature: a facility, which consists of one 2-storey office building, one 1-storey production/warehouse building, one 2-storey central utility building, one 4-storey dormitory building, etc., is designed for the manufacture of moulded plastic tableware of platters, lids, bowls, utensils and packaging products.
year of completion: 2006

phelps dodge magnetic wire factory

developer: phelps dodge corporation, usa
project location: sip, suzhou, jiangsu, china
project information:
site area: 26,000 m2
gross floor area: 13,000 m2
no. of floors: 1.5-storey
building nature: a facility, which consists of office, production, warehouse and utilities buildings, is designed for the manufacture of magnetic copper wires for electric motors.
year of completion: 2003

techtronics industrial park

developer: techtronics industries ltd, hong kong
project location: houjie, dongguan, guangdong, china
project information:
site area: 275,000 m2
gross floor area: 384,000 m2
building nature: a private industrial park, which consists of one 6-storey admin building, six 3-storey production buildings, one 3-storey central warehouse building, several 6-storey dormitory and amenity buildings, etc., is designed for the manufacture and fabrication of power tools, floor care products and garden care products, and for the accommodation of 12,000 staff and workers.
year of (design) completion: 2004

emerson copeland climate technologies factory

developer: emerson motor technologies, usa
project location: sip, suzhou, jiangsu, china
project information:
site area: 99,800 m2
gross floor area: 29,000 m2
no. of floors: 1.5-storey
building nature: a manufacturing facility, developed in three phases, is designed for the manufacture and fabrication of scroll compressors and hermetic motors for air conditioners.
year of completion: 1998 (phase 1), 1999 (phase 2), 2001 (phase 3)

zastron flexible printed circuit factory

developer: zastron precision-tech ltd, hong kong
project location: wuxi new district, wuxi, jiangsu, china
project information:
site area: 43,700 m2
gross floor area: 48,700 m2
no. of floors: 3-storey
building nature: a facility, which consists of high precision workshops, clean rooms, electroplating workshops, etc. is designed for the manufacture and fabrication of flexible printed circuits applied in advanced electronic products.
year of completion: 2009

chai wan public fill barging point

developer: cedd, hong kong government sar
project location: adjoining chai wan cargo basin
project information:
a facility, designed to handle earth materials which are trucked in, weighed, tolled, staged and barged to fill, includes a combined admin building, a combined reception office building, a tipping hall building, a sampling facility building, two exit office buildings, etc.
year of completion: 2008

附註 notes:

嘉聯設計有限公司quartect design limited位於香港永樂街28-34號東成商業大廈12樓b-c室,以上資料由建築師事務所自願提供,brokwiki收集於網絡,但並不保證其真確性。

發佈留言 0

Your email address will not be published. Required fields are marked *