一建築設計事務所有限公司 Studio One Design Limited

名稱一建築設計事務所有限公司
studio one design limited
地址香港上環文咸東街135號文咸東街135商業中心2101室
rm 2101, 135 bonham strand trade centre 135 bonham strand, sheungwan, hong kong
電話號碼3118 9238 
傳真號碼3118 9231 
電郵地址[email protected] 
聯絡人ms. alice yim 
職位deputy director 
成立年份2005 
員工總數16 
註冊建築師總數
獲授權人總數

提供服務 services

  • alterations & additions works and minor works
  • commercial
  • educational
  • industrial
  • interior design
  • religious

建築作品

concierge for
one ifc, hong kong

design and provision of the new concierge counters at foyer to main entrance floor on 3/f for one ifc. the counters were completed in 2007, and, being replaced in 2012.
year of completion: 2007
http://www.sodl.hk/?cat=6

hkfyg tai po lions
youth s.p.o.t.

overall refurbishment and interior fitting out of the 2-storey free standing youth centre at no.2 po heung street, tai po market, n.t. for the hong kong federation of youth group
year of completion: 2010
http://www.sodl.hk/?cat=6

apple store, ifc mall, hong kong

to work with the apple's design team (us interior designer, uk structural engineer) and local liaison consultant team (woods bagot, ove aurp and jrp) on the a&a works and re-configuration of the apple store (tenant area) on the western retail bridge (landlord area) at pl1 and pl2 of ifc mall, central, hong kong
year of completion: 2011
http://www.sodl.hk/?cat=6

a&a and improvement works
at ifc mall, hong kong

project manager and designer for renovation of visitor lavatories and re-configuration of ceiling for the mall and, as the authorized persons for the a&a works at various locations of the ifc mall since 2007.
year of completion: 2010
http://www.sodl.hk/?cat=6

offices for
ernst & young, hong kong

office relocation project 2008 for ernst & young group ltd including: a&a and reinstatement works of the existing office premises at 12/f to 18/f two ifc, central, h.k., and, project management and interior fitting out works at: 43,000 sq. ft. existing office areas at 18/f, two ifc and 2/f & 4/f hutchison house, central 65,000 sq. ft. new office areas at 60/f – 62/f one island east, quarry bay
year of completion: 2009
http://www.sodl.hk/?cat=6

a&a and renovation works for esf schools

full project management and lead consultancy services for a&a works and annual facilities maintenance, repair and improvement works for esf schools including: full re-decoration at glenealy school, improvement works at island school, south island school, kennedy school and renaissance college, and a&a works at west island school, kennedy school, bradbury school, and, quarry bay school.
year of completion: 2007-2011
http://www.sodl.hk/?cat=6

memorial hall for
canossian mission, hong kongmemorial hall for
canossian mission, hong kong

a&a and full renovation works at 34 caine road, hong kong for provision of a memorial exhibition hall, audio/ visual room, parlous and store rooms for celebrating the 200th year of foundation of the colossian missions in hong kong
year of completion: 2008
http://www.sodl.hk/?cat=6

our lady of lourdes
chapel at lama, hong kong

architect for the new our lady of lourdes chapel at wang long, dd3 lot 1709, yung shue wan, lamma island, hong kong. serving as the client’s representative to liaise and co-ordinate with the district land office and other stakeholders from inception stage through implementation to completion of the new chapel project.
year of completion: 2011
http://www.sodl.hk/?cat=6

houses development at mt. kellet rd, the peak

houses development at mt. kellet rd, the peak
year of completion: 2009
http://www.sodl.hk/?cat=6

data centre for
pacnet

&a and overall renovation works for conversion of the existing cable landing station into a 45,000 sq. ft. tier iii data centre space, and qualified for gold rating from the leeds
year of completion: 2012
http://www.sodl.hk/?cat=6

附註 notes:

一建築設計事務所有限公司studio one design limited位於香港上環文咸東街135號文咸東街135商業中心2101室,以上資料由建築師事務所自願提供,brokwiki收集於網絡,但並不保證其真確性。

發佈留言 0

Your email address will not be published. Required fields are marked *